Basic cocomo mmodel program in c2/7/2023 ![]() Semidetached: A development project can be considered of semidetached type, if the development consists of a mixture of experienced and inexperienced staff.Organic: A development project can be considered of organic type, if the project deals with developing a well understood application program, the size of the development team is small, and the team members are experienced in developing similar types of projects.According to the Boehm any software development project can be classified into one of the following three categories based on the development complexity: organic, semidetached, and embedded. ![]() ![]() COCOMO (Constructive Cost Estimation Model) was proposed by Boehm (1981). ![]()